Your assistance is needed to help repaint this diesel to orginal colors and assist with final restoration.

Friday, June 8
Former NC&StL GE 44 ton deisel switch engine is moved onto tracks at the Cowan Railroad Museum
The Final Move
August 17 through 25 turned out to be a very long work-week, as Tom Knowles spent his
September 8 and we're nearing the deadline of having 100 painted prior to Polly Crockett Days, Sept. 15-16. Scattered showers prevented work on the engine for the last 10 days or so, but the rain was desperately needed, so we didn't complain. 

Maryann Knowles, David Ellenburg and Mark Ledbetter start masking and painting the red.  By 5:30 pm, the bottom of the engine is complete.
September 8
Mark Ledbetter and Maryann Knowles start masking and painting the red.  Masking is extremely tedious, but the painting goes quickly with the help of another Cowan resident.  A crowd gathers as we begin removing the tape to reveal the final paint job.  Removing the masking tape is almost as tedious as putting it on correctly, and the work continues until after sunset.  What fun painting the handrails after dark!
September 9
Mark and Maryann both needed a day off from painting, so Monday, September 10 was down time of sorts -- Mark worked his regular job, and Maryann crashed big time.  Tuesday September 11 brought a heavy downpour, so no more painting today, either.  But here are some pics of NC 100 bright and shiny from the raindrops.  Hope we have nice weather the next few days....!
No photos from the 12th, as Maryann was working on her own.  She got the straight stripes completed on one quarter panel.  September 13 brought 2 volunteers.  Bob Hancock painted a bunch of grab irons, and Robert Duncan (aka
September 13
September 15, and the Polly Crockett Festival begins!  Amid all the festivities, painting 100 continues.  Terry and Jane Coats drove down from Nashville to assist the efforts, and we couldn't have done it without them!  Terry spent the better part of the day just making a template so the curves would at least be similar. Street side paint job is finally complete with only a little touch up need here and there.  A local sign maker is working on the decals, and everything is coming together.
September 15
Sunday, September 16 found Tom painting the engine while Maryann worked the depot.  Terry's template worked great, and Tom managed to finish all the curved areas as well as most of the front. The goal was to have the engine painted by Polly Crockett Festival, and by the end of the two day extravaganza,  99% of the exterior painting is now complete.  The engine still needs touchup on several areas and the cab interior still needs paint.  The cab also needs to be secured (with a hasp and lock) so replacement gauges will not be destroyed when they are installed.  

We were unable to get the front engine (#1) started because it's losing its prime. Possibly a bad fuel line on the inlet side between the pump and the fuel tank.  Something else to be worked on.
Just a few random shots of electronics in the cab, and the battery compartment.
Electronics in the Cab